Optimized wastewater treatment plant thanks to study project
In their practice-oriented master's theses, environmental engineers Louis Barth and Diego Gregorio show how smart control of the Olten wastewater system could reduce infrastructure costs and improve water protection. Especially during heavy rainfall, optimized measurement and control technology allows the wastewater pipes to be utilized more evenly, thus fully exploiting the wastewater treatment potential. These findings will now be implemented to improve the wastewater treatment plant.
The study project was featured by the Swiss newspaper external page Solothurner Zeitung
Learn more about the D-BAUG Study Programme in Environmental Engineering